news in english

The working schedule of Väo quarry

  • Post author:
  • Post category:News

In connection with the transition to the winter working schedule, since 16.12.2022 the Väo quarry is opened as follows: During the working days: 7:30 – 16:30 Closed on weekends.

Continue Reading The working schedule of Väo quarry
<strong>Concrete manufacturer: the situation is better than during the last crisis, but the shake-up will come in a different way</strong><strong></strong>
Kalle Suitslepp, manager of Betoonimeister AS, walking around the company premises, according to his words, the end of the year will be challenging. Concrete, as a very important building material, has become synonymous with construction and investment, according to Kalle Suitslepp words. Photo: Andras Kralla.

Concrete manufacturer: the situation is better than during the last crisis, but the shake-up will come in a different way

  • Post author:
  • Post category:News

Although concrete manufacturers are concerned about the collapse of the construction sector and the rise in cement prices, the situation is much easier now than during the previous economic downturn,…

Continue Reading Concrete manufacturer: the situation is better than during the last crisis, but the shake-up will come in a different way

Overview of the construction materials market: In the 1st half of the year manufacturers successfully increased volumes

  • Post author:
  • Post category:News

The 1st half of the year was successful for Estonian manufacturers of construction materials because the sharp increase in input prices could at least partly be transferred to the price…

Continue Reading Overview of the construction materials market: In the 1st half of the year manufacturers successfully increased volumes
<strong>Funding for road construction is drying up, and thousands of people are at risk of losing their jobs</strong><strong></strong>
Hard times for road construction. Photo: Liis Treimann

Funding for road construction is drying up, and thousands of people are at risk of losing their jobs

  • Post author:
  • Post category:News

The state plans to allocate so little money to road construction in the coming years that, according to entrepreneurs, it is impossible to avoid layoffs. The head of the Trev-2…

Continue Reading Funding for road construction is drying up, and thousands of people are at risk of losing their jobs
Estonian Environmental Board: supply of limestone is very critical in Estonia
The Aru-Lõuna quarry, owned by Kunda Nordic Cement, is eight times the size of the planned Paas quarry, or 400 ha. ehitusuudised.ee

Estonian Environmental Board: supply of limestone is very critical in Estonia

  • Post author:
  • Post category:News

An entrepreneur wants to build a limestone quarry in Paasi village of Haljala municipality. Both the local residents and the local government have reacted strongly to this plan. However, the…

Continue Reading Estonian Environmental Board: supply of limestone is very critical in Estonia